Sungrow energy storage systems
Source Sungrow storage systems, batteries and components against the operating task, power, stored energy and connection design.
PowerTitan 2.0
A containerised storage system for large installations, integrating batteries and power conversion with liquid cooling.
- PCS rated 2520 kW
- Battery capacity 5015 kWh
- Configuration against the plant design
PowerStack ST255CS-2H
A commercial and industrial storage system with liquid cooling. Evaluate power and stored energy separately for the intended operating scenario.
- Rated power 125 kW
- Energy capacity 257 kWh
- Nominal AC voltage 400 V
SBH high-voltage batteries
Modular LFP batteries for supported storage configurations. Identify the module count per stack and the number of parallel stacks.
- Each module stores 5 kWh
- One stack provides 10–40 kWh
- Up to 4 stacks, total up to 160 kWh
Power conversion equipment
The PCS interfaces the battery system with the installation electrical system. Define it against the storage model and connection design.
- Storage model and version
- Power and grid requirements
- Converter supply boundary
Control and data interfaces
Consider BMS and EMS within the storage system architecture. Provide device identification and the communication diagram.
- Battery assembly configuration
- Controller identification
- Interfaces and communication diagram
Liquid-cooling components
Tie a cooling component enquiry to the exact cabinet or container version. Component markings and a circuit diagram help identify the item.
- System and component nameplates
- Connection photographs
- Spare-parts schedule position
Storage component sourcing
Identify an item by its markings, documentation and assembly position. Keep the relationship to the installed equipment in the enquiry.
- Full model and serial number
- Replacement component designation
- Quantity and assembly scope
Power and energy sizing
Specify required power, operating scenario and the load profile. Evaluate stored energy against the installation task.
- Power expressed in kW
- Stored energy expressed in kWh
- Operating scenario and load profile
Choosing a Sungrow energy storage system
Start with the task: solar storage, industrial consumption management or utility operation. A useful brief includes the load profile, connection diagram and existing equipment schedule.
A residential battery stack, an industrial cabinet and a containerised system differ in architecture and supply scope. Identify the system class before selecting the configuration. Separate the battery, power conversion, controls and external electrical equipment in the enquiry.
Where a design already exists, provide the approved schedule. For an initial sourcing discussion, describe the scenario and known site parameters so the equipment requirements can be developed with the project engineer.
PowerTitan 2.0 for large installations
PowerTitan 2.0 combines batteries and PCS in a containerised architecture. Its official product information lists 2520 kW of PCS power and 5015 kWh of battery energy. Keep these values separate in procurement and engineering documents.
State the number of containers, their connection arrangement, the connection-point voltage and the transformer configuration. Where construction is phased, assign equipment to each stage. Identify the control and communication devices included in the enquiry.
This schedule defines the boundary between the supplied storage system and site infrastructure, including cables, distribution equipment and installation work, so the project team can compare offers on an equivalent basis.
PowerStack for commercial and industrial sites
ST255CS-2H combines a rated power of 125 kW with 257 kWh of stored energy and a nominal AC voltage of 400 V. The number 255 in the model name is not a substitute for the energy value in the product information. Provide the site's daily load profile and intended operating scenario.
State whether the storage system will work with existing solar equipment or as a separate installation. Multiple cabinets require an agreed control and connection arrangement. Identify the exact model, quantity and accessories in the purchasing schedule.
For a component request, include its own identification, the system nameplate and its position in the equipment documentation.
Configuring SBH battery stacks
SBH uses 5 kWh modules to form stacks with capacities of 10–40 kWh. The manufacturer lists up to four parallel stacks, providing up to 160 kWh in a supported configuration. Specify modules per stack, stack count and the connected inverter model.
An expansion enquiry also needs details of the existing battery and control system. Distinguish a single module, a battery stack and a complete installation set in the purchasing schedule. For a replacement, provide photographs of the relevant labels and the original equipment list where available.
This establishes the requested item and assembly scope before supply options are compared.
Power, energy and the operating profile
Power describes the rate of energy exchange, while energy capacity describes the amount stored. Record both together with the intended operating mode. A load profile shows when charging, discharging or a change in site consumption is required.
Describe different scenarios separately because the same battery capacity can lead to different converter requirements. Include the engineer's design assumptions and selected system configuration in the commercial enquiry.
Dividing energy by power alone does not establish guaranteed site operating time. Actual performance depends on the agreed operating range, loads and conditions for the selected equipment, which should be assessed within the project design.
PCS and external electrical equipment
The power conversion equipment interfaces the storage system with the site's electrical network. Its selection depends on the battery system, voltage levels, required power and connection diagram. If PCS forms part of a factory cabinet or container configuration, record it as part of that system.
A request for a separate converter needs the complete designation and electrical interfaces. External transformers, distribution equipment, protection and metering require their own agreed schedule. This separation avoids comparing quotations with different equipment boundaries.
For an operating installation, keep the relationship between the converter, battery section and controller in the project records used for sourcing.
Battery control and energy management
BMS concerns the battery system, while EMS is considered in the wider energy-management architecture. Provide the control diagram, controller schedule and required connections to external automation.
For an industrial installation, describe the commands and data that must be exchanged with the site's control system. Identify retained equipment separately during a retrofit.
Hardware replacement needs a part number or device marking; a functional change needs a clear operating brief and agreed interfaces. This connects the equipment enquiry with the control design.
Keep software configuration work and hardware items as separate positions so the responsibilities and purchasing scope remain clear.
Cooling equipment and site conditions
PowerTitan 2.0 and ST255CS-2H use liquid cooling according to their product information. System placement must account for the project's site, service-access and heat-rejection requirements.
For a cooling component enquiry, provide the storage model, component designation and the relevant circuit diagram. Connection photographs help clarify the assembly scope.
A fault description alone does not identify the item to purchase; use documentation or the servicing organisation's confirmed requirement. For a new project, submit environmental conditions with the equipment questionnaire.
These details support selection of the system version and associated equipment before procurement is finalised and site work is planned.
Replacement and expansion of operating systems
Begin an expansion enquiry with a schedule of installed batteries, converters and controllers. Include full model designations, serial numbers and system version details from the operating documentation. Describe the intended result and proposed supply boundary separately.
For component replacement, attach the old item's identification and its assembly position. A complete cabinet or container replacement requires the connection design. This approach allows alternatives to be assessed at system level, including control and electrical interfaces.
The engineering decision on changes to the installation should use the documentation for the specific equipment version and the conditions at the operating site.
Supply scope and incoming inspection
List the main storage equipment, accessories, communication devices and agreed spare parts as separate positions. Each entry needs a model, quantity and assembly description. For a phased project, allocate equipment to the relevant stage or site.
At receipt, check package count, visible packaging condition and identification against the order. Save photographs of system labels and package markings with the project records. If parts of the system arrive separately, note their relationship in the schedule.
A clear handover supports installation and later tracking of battery stacks, cabinets, containers and the control devices actually supplied to each location.
Preparing a purchasing enquiry
Send the storage application, required power and energy, delivery destination and equipment schedule. For an operating system, add nameplate photographs and a diagram; for a spare part, add its own marking and quantity.
An initial enquiry can describe the task and known site conditions before the final configuration is agreed. Use a spreadsheet for a large list and retain original manufacturer designations and your internal position numbers.
State whether the request covers a complete system, batteries, PCS, control equipment or a replacement assembly. Clearly separated positions support comparable quotations and an agreed set of documents for the selected equipment.
Keeping a useful equipment record
A site equipment register links each cabinet or container to its battery assemblies, conversion equipment and control devices. Record the complete installed versions and retain the relevant documentation with that register.
A spare-parts schedule can then refer to specific equipment rather than a broad storage-system name. When maintenance identifies an item for replacement, add its designation and position to the enquiry. Keep planned spares separate from equipment for an expansion project.
After receipt, compare the supplied identification with the purchasing schedule and update the records. This gives future enquiries a consistent starting point and helps the operating team distinguish similar assemblies.
Availability, pricing, lead time, compatibility, documentation and cloud functions are confirmed for the selected version. This page does not establish authorised dealer status or an undertaking to provide design or installation services.
Other Sungrow businesses
- Equipment and materials for Sungrow PV Inverter
- Equipment and materials for Sungrow Charging
- Equipment and materials for Sungrow Floating PV
- Equipment and materials for Sungrow Wind
- Equipment and materials for Sungrow Hydrogen
- Equipment and materials for Sungrow Smart Energy
- Equipment and materials for Sungrow Renewables