Yingkou Jinchen Machinery / Jinchen Corp Equipment — PV Module Lines, Laminators & PECVD
Industrial equipment by Yingkou Jinchen Machinery / Jinchen Corp: Q1–Q5 solar module lines (100–500 MW), vacuum laminators, high-speed layup and soldering units, PERTOP/HJT PECVD systems, perovskite PVD lines, and hydrogen electrolyzer automation.
Q1–Q5 Automated Solar Module Lines
Yingkou Jinchen Machinery / Jinchen Corp Q1–Q5 lines cover 100–500 MW/year PV module assembly. Stations handle taping, EVA/TPT cutting, layup, framing, and EL/AOI checks. Spare parts include conveyor belts, servos, pneumatic cylinders, optical sensors, and PLCs.
- Q1–Q5 output: 100–500 MW/year
- Supports PERC, TOPCon, and HJT
- EVA/TPT cutting and curing sections
- Belts, servos, pneumatics, and PLCs
Fully-Automatic Solar Module Laminators
Jinchen single, dual, and three-chamber vacuum laminators reach 350 MW/year at 30 Pa ultimate vacuum. Active heating plates up to 25.38 m2 run at 30–180 °C (±1 °C) for EVA/POE films. Wear spares include PTFE fabrics, silicone diaphragms, gaskets, heaters, and pumps.
- Capacity: up to 350 MW/year
- Ultimate vacuum: 30 Pa (<120 Pa in 120 s)
- Heating 30–180 °C, ±1.5 °C uniformity
- PTFE belts, membranes, gaskets, heaters
Cell String Layup, Soldering & Shingling
Jinchen 1-to-1 (10 kW) and 1-to-2 (17 kW) layup units serve 6000–12000 pcs/h stringers at ±0.3 mm accuracy. Induction busbar soldering cycles ≤20 s (≥5 N/mm peel); shingling reaches 3200 UPH. Spares include linear motors, vacuum cups, induction coils, and sensors.
- Layup cycle: ≤30 s (1-to-2), ±0.3 mm
- Busbar soldering: ≤20 s, ≥5 N/mm
- Shingling: 3200 UPH, ±0.15 mm accuracy
- Linear motors, suction cups, inductors
EL/AOI Inspection & Automatic Framing
EL&FAOI-MIS-2 inspects modules up to 2500×1500 mm in 19 s via 12 EL (2.3 MP) and 12 AOI (12 MP) cameras with 5-minute setup. JC.GF90158 frames modules up to 50 kg in 20 s at 13 kW. Spares cover cameras, lenses, dispensing valves, suction pads, and encoders.
- EL&FAOI-MIS-2: 19 s cycle, 5 min setup
- 12x 2.3 MP EL + 12x 12 MP AOI cameras
- JC.GF90158 framing: 20 s, 50 kg max
- Cameras, illuminators, valves, pads
PERTOP Tube & HJT Inline PECVD Systems
Jinchen PERTOP tube PECVD and inline HJT PECVD systems deliver up to 10000 WPH capacity across M2-M12 wafers with RF deposition and RPS self-cleaning. Low-dust pulsing prevents a-Si de-filming. Spares cover RF generators, match boxes, MFCs, gate valves, and quartz.
- PERTOP tube PECVD: SiOx + doped a-Si
- HJT inline PECVD: 10000 WPH, M2–M12
- RF deposition + RPS plasma self-clean
- RF power, match boxes, MFCs, gate valves
Perovskite PVD & Hydrogen Electrolyzer Lines
Calcite ZDX and ZCJ-300/600/1200 PVD lines run at 8×10^-5 Pa with ≤±3% uniformity for ITO, NiO2, and Cu targets. Hydrogen electrolyzer lines process 1000–2000 Nm3/h frames at 5 min/piece (>60/year). Spares include crucibles, cathodes, cryo-pumps, and grippers.
- ZDX / ZCJ-300/600/1200: 8×10^-5 Pa
- Sputtering uniformity ≤±3%, ≥200 h run
- Electrolyzer line: 1000/2000 Nm3/h
- Crucibles, targets, cryo-pumps, grippers
Selecting Q1–Q5 Module Lines & Cell PECVD Capacity
Yingkou Jinchen Machinery / Jinchen Corp engineers turnkey solar module lines ranging from 100 MW/year (Q1) up to 500 MW/year (Q5), compatible with 1650–2500 × 980–1400 mm laminates and conventional or half-cell MBB layouts.
When sizing a line, plant teams align stringer throughput (6000 or 12000 pcs/h) with 1-to-1 or 1-to-2 layup cycle times (≤30–60 s) and 20 s busbar soldering.
For high-efficiency cell lines, PERTOP tube PECVD stabilizes thin silicon oxide and doped amorphous silicon layers with low-dust pulse oxidation, while inline HJT PECVD runs at 10000 WPH (M6 baseline, M2–M12 compatible) using dedicated RF deposition and RPS cleaning zones.
Lamination, Perovskite Coating & Electrolyzer Lines
Fully-automatic single, dual, and three-chamber laminators deliver up to 350 MW/year with 2400 × 5500 mm × 2 heated area, 30 Pa ultimate vacuum, and ±1.5 °C plate uniformity for EVA and POE encapsulation.
Integrated EL&FAOI-MIS-2 vision inspection completes 24-camera checks in 19 s with 5-minute product changeover.
Beyond silicon PV, Jinchen builds ZDX-300/600/1200 evaporative and ZCJ-300/600/1200 sputtering lines (8×10^-5 Pa, ≤±3% film uniformity, ≥200 h run) for perovskite absorbers/electrodes and automated 1000–2000 Nm3/h hydrogen electrolyzer assembly lines (>60 units/year).
Yingkou Jinchen Machinery / Jinchen Corp and model names are trademarks of their respective owners and are used only to identify the equipment for which we source parts. SpareX is not an official dealer, distributor or representative of Yingkou Jinchen Machinery / Jinchen Corp and is not affiliated with the trademark owner. Origin, documents and warranty are stated for each item in the quotation.
Related equipment manufacturers
- Equipment and parts for Zumbach Electronic
- Equipment and parts for Yilmaz Reduktor
- Equipment and parts for Zucchini S.R.L. / Zucchini Packaging
- Equipment and parts for Yeong Long Air Hydraulics
Documents and sources
- Company Profile — Yingkou Jinchen Machinery / Jinchen Corp
- Chinese Corporate Profile — Jinchen Corp (603396)
- Solar Module Fully-Automatic Laminator Specifications
- High-Speed Cell String Automatic Layup Machine (1-to-1)
- High-Speed Cell String Automatic Layup Machine (1-to-2)
- Multi-Function Busbar Soldering Machine
- Solar Cell Shingling Machine Specifications
- Solar Module EL/AOI Inspection Machine (EL&FAOI-MIS-2)
- Automatic Frame-Placement and Framing Machine (JC.GF90158)
- PERTOP High-Efficiency Solar Cell Tube PECVD Solution
- Heterojunction (HJT) Solar Cell PECVD Solution
- Perovskite Evaporative Plating Line (ZDX-300/600/1200)
- Perovskite Magnetron Sputtering Line (ZCJ-300/600/1200)
- Electrolyzer Assembly & Test Line (1000/2000 Nm3/h)
- Jinchen Brand Service & Engineering Team
- Jinchen Headquarters and Global Technical Service Centers
