ClydeUnion Pumps equipment and spare parts
Specify ClydeUnion Pumps for process, power and water applications. Send the duty point and equipment documents for a complete pumpset or maintenance-parts enquiry.
CUP-OH2 — overhung pumps
A single-stage end-suction pump with a radially split casing. Its back pull-out construction permits removal of the rotating assembly while the suction and discharge pipework remains connected. Identify an installed unit by its serial number and drawing reference.
- API 610 construction
- Horizontal pump arrangement
- Match the impeller, shaft and seal assembly to the build
- Provide the nameplate and drawing item number
CUP-OH3 — vertical in-line pumps
This single-stage in-line centrifugal pump has a separate bearing bracket and a vertical arrangement. The manufacturer identifies the VLK-BB model within this range. For replacement parts, supply the installed pump designation together with the bearing and rotating-assembly drawing.
- API 610 and API 682 design
- Vertical in-line installation
- Back pull-out rotating assembly
- Specify the fluid, duty point and existing drive
CUP-OH4 — single-stage in-line pumps
A vertical family for oil and gas processing, power generation and desalination duties. The rotating assembly can be withdrawn for maintenance. When replacing an installed unit, provide the outline drawing, connection dimensions and seal specification as well as the series name.
- API 610 and API 682 construction
- Single-stage vertical arrangement
- Process and water-service applications
- Confirm the connection dimensions and seal configuration
CUP-BB1 — axially split pumps
A heavy-duty horizontal family with the rotor supported between bearings. The manufacturer offers application-specific drive, sealing and lubrication arrangements. An impeller or casing-part enquiry should identify the serial number and hydraulic configuration of the actual installed pump.
- Axially split casing
- API 610 and API 682 design
- Pipeline, condensate and water duties
- Specify the hydraulic build and package scope
CUP-BB2 — radially split pumps
Horizontal single- or two-stage double-suction pumps for oil and gas, power and desalination applications. Suction and discharge connections may use different arrangements. An installed-pump replacement therefore needs a dimensional drawing, together with the stage count and operating conditions.
- Radially split casing
- Between-bearings rotor
- API 610 construction
- Identify the stage count and nozzle arrangement
CUP-BB3 — multistage pumps
A horizontal axially split design with opposed impellers for medium- and high-pressure duties. Applications include boiler feed and water injection. A rotor enquiry needs the number of stages, first-stage configuration and hydraulic drawing, alongside the required operating point.
- API 610 and API 682 design
- Multistage hydraulic arrangement
- Water injection and boiler-feed applications
- Provide the rotor drawing and required duty point
CUP-BB5HP — high-pressure pumps
Multistage diffuser pumps with a radially split barrel casing and either in-line or back-to-back impellers. The Shear Ring retention system permits cartridge withdrawal without disturbing pipework.
Identify a spare cartridge by the pump serial number, stage arrangement and approved hydraulic drawing.
- API 610 and API 682 design
- Seawater and produced-water injection
- Withdrawable internal cartridge
- Provide the pump number and stage configuration
CUP-VS1 — vertical turbine pumps
A heavy-duty multistage family for wet-pit and deep-well installations, designed without a suction barrel. Column sections, shafting and hydraulic stages must be matched to the installed depth and support arrangement. Supply an outline drawing and the pump number for an enquiry.
- API 610 and API 682 design
- Without a suction can
- Water intake, cooling and firewater duties
- Provide the general drawing and immersion depth
CUP-VS6 — vertical can pumps
A multistage vertical design with a suction barrel for dry- or wet-pit installation. Applications include condensate, hydrocarbons and chemical transfer. When replacing the pumping element, confirm the barrel, column, stage configuration and mounting interface using the original equipment drawings.
- API 610 and API 682 design
- With a suction can
- Condensate and process-fluid applications
- Specify suction conditions and mounting dimensions
CUP-VSM — submersible pumpsets
Single- or multistage centrifugal pumps integrated with a water-filled submersible motor. Typical duties include seawater lift, cooling-water supply and borehole extraction. Identify the pump and motor separately in a replacement enquiry, including the electrical data and required package scope.
- Water-filled submersible motor
- Single- and multistage options
- Offshore and water-intake applications
- Provide electrical ratings and the pumpset scope
Impellers, shafts and spare cartridges
Send rotating-assembly enquiries with the pump number and drawing reference. Distinguish a loose impeller from a rotor or complete internal cartridge, because their supply scope differs. Identify the installed stage count and the purpose of the replacement or maintenance set.
- Model, serial number and drawing item
- Stage count and rotation direction
- Impeller diameter and documented material
- List the components required in a complete cartridge
Seals, bearing assemblies and maintenance sets
For a mechanical seal, bearing support or wear-parts set, provide the assembly specification. Match the construction, materials and mounting dimensions to the actual unit. Describe the observed symptoms so the plant engineer can define the required component scope before ordering.
- Assembly number and section drawing
- Fluid, temperature and seal arrangement
- Bearing support and lubrication configuration
- Itemised consumables list with quantities
Define the pump duty before choosing a series
Start with the required task: a new pumping package, replacement of an installed unit or procurement of maintenance parts. For an existing installation, send the nameplate and equipment documents.
For a new project, provide the pumped fluid, required flow, head, temperature and installation conditions.
OH, BB and VS describe construction families. Retain the full equipment designation, serial number and drawing reference in your enquiry. If the available documents show different revisions, attach them with a note identifying which revision represents the pump currently installed at the plant.
Operating point and fluid specification
State the normal, minimum and maximum flow and head, together with available suction pressure. Add fluid temperature, density, viscosity and information about gas or solids. For water-intake systems, provide water quality and reservoir levels.
These data allow the technical enquiry to describe the actual duty.
When the required operating conditions are changing, include the existing pump curve, impeller diameter and drive rating. Identify whether the enquiry concerns a replacement part for the current build or a hydraulic change for a new duty point. Keep those two scopes separate in the purchasing list.
Identify parts using the installed pump documents
Provide a clear photograph of the complete nameplate, the pump general arrangement and each required drawing item. State quantities separately. For several pumps, use a list linking the equipment number, item designation, part description and quantity.
This keeps every component associated with the correct installed unit.
If a part number is unreadable, add photographs of the mounting interface and any remaining identification. Include the relevant assembly drawing or previous specification.
The plant engineer should define whether the required scope is an individual component, a consumables set or a complete assembly.
Define the scope of a rotor or cartridge
Identify whether the enquiry is for a shaft and impellers, an assembled rotor or a complete spare cartridge. List the components that should be included. For a multistage pump, preserve the stage sequence and first-stage configuration shown in the hydraulic and assembly drawings.
For a planned shutdown, specify the number of pumps to be serviced and the purpose of each maintenance set. Separate installed-unit replacement parts from workshop spares.
State plant requirements for identification, preservation and packing so the supply scope can be checked against the maintenance plan.
Drive and package boundaries
List the pump, driver, coupling and base separately. Specify power supply, operating speed, control method and plant requirements for the motor. A complete replacement package also needs the foundation layout, nozzle orientation and available space. Identify components that will remain in service.
If the existing driver will be reused, attach its rating information and coupling designation. For a new package, define the requested pump, drive, base, instruments and accessories.
A clear scope supports technical comparison of quotations and helps the receiving team prepare an itemised acceptance list.
Materials and service conditions
Retain the materials specified for the casing, shaft, impeller, sleeves and sealing components in the drawings. Provide the fluid composition and relevant corrosion, wear or temperature conditions.
For seawater service, include the project material requirements rather than assigning one material to the whole pump.
If a material change is being considered, describe its purpose and attach the current specification. Identify the required inspection and documentation.
Replacing a component to an existing drawing and changing the pump design are separate engineering scopes that should be reviewed with the responsible plant specialist.
Documents for technical and purchasing review
Attach the pump data sheet, general arrangement, assembly drawings and itemised specification. For a new pumping installation, include the project enquiry sheet.
Identify documents required before ordering for engineering approval, as well as documents that should accompany the supplied equipment or maintenance components.
Use consistent designations and units throughout the list. Preserve original drawing values when a different unit system is used. State common requirements once, then record differences in material, quantity or supply scope beside the relevant items.
This helps technical and purchasing teams review the same equipment definition.
Send an equipment or maintenance enquiry
Choose a pump family or a maintenance component and open the enquiry form. Enter the full model, pump number, quantities and purpose of the request. Attach drawings or photographs. For a long parts list, use a separate file and summarise the requested scope in the message.
A new installation benefits from an enquiry sheet; a maintenance request benefits from an inspection report and component specification. State the delivery destination and a technical contact at the plant.
The supply scope can then be clarified item by item against the documents provided for engineering review.
Availability, price, delivery, documents and compatibility require confirmation for each enquiry. This page does not establish authorised dealership, certified servicing or identical performance across every configuration in a pump family.