ARTIFICIAL LIFT AND PUMPING SYSTEMS

CENtrilift and Baker Hughes artificial lift

Specify Baker Hughes artificial-lift equipment from the project duty. Identify CENtrilift, ESP and surface-equipment components from their markings and documents.

Equipment groups and components

Identify the particular device or required system. Retain independent device markings and their association with the complete installation.

Electrical submersible pumping systems

Baker Hughes artificial lift includes electrical submersible pumping systems, with published solutions such as CENefficient. Define the project duty and required system boundaries for a new installation.

For an existing system, identify the particular component, its markings and applicable documents. The overall ESP designation does not identify every internal assembly or replacement item.

CENtrilift ESP induction motors

CENtrilift ESP induction motors form a named category in the official portfolio. Preserve the motor’s complete markings and serial number, together with its association to the installed pumping system.

Specify a complete motor, assembly or individual component, using the corresponding documents and original references. List retained interfaces and any required accompanying items separately.

ESP pump sections and intakes

The ESP portfolio identifies pumps and intakes as separate groups. Published solutions include the 400 Series LIFTPrime high-efficiency E2000 pump. Retain the complete designation and the installed section’s own documents.

A parts enquiry should identify the assembly reference, drawing position and quantity; a complete section request should define its required contents.

Gas-handling equipment

Published equipment includes ACE Plus gas handler pumps and the Boosted GasSep gas separator. Distinguish the particular device and its place in the system when preparing an enquiry. Keep device-specific references and documents together.

Components of different gas-handling devices should remain separate lines even when they form part of one pumping installation.

ESP power cables and seals

ESP power cables and ESP seals are distinct groups within the artificial-lift portfolio. Preserve each component’s own marking and applicable system records. Cable lengths need explicit units, while connection items should be listed separately.

For a protective assembly or kit, attach its documented contents and identify whether the request covers the complete assembly or individual elements.

Power supply and control

The portfolio includes ESP variable speed drives, horizontal pump variable speed drives and switchboards. Provide the device nameplate, complete type and electrical documents. Identify a complete control device separately from an internal module or other component.

Define the retained system interfaces and requested equipment boundaries when planning replacement of surface power or control equipment.

Gas lift equipment

The gas-lift group includes mandrels, valves, sensors and gauges. Identify the particular item, its complete original designation and documents for the installed arrangement. Preserve quantities and distinguish an individual product from an assembly or set.

A general gas-lift system name should remain context rather than replacing the reference of the required component.

HPump surface systems and monitoring

Surface pumping includes HPump systems, horizontal pumps, frames and thrust chambers. Well-monitoring products include SureSENS electronic well monitoring. Independently identified devices need their own references and technical records.

Separate hardware components from software or service requirements, defining the actual supply scope instead of treating all functions as part of one equipment item.

Selection inputs

Purpose, well or process data, operating cases, installation conditions, power and required system boundaries.

Components for an installed system

Device, complete type, serial number, original item, quantity and assembly documents.

Artificial lift and the component boundary

The Baker Hughes artificial-lift portfolio covers ESP systems, gas lift, surface pumping, power, control and monitoring. CENtrilift is named within the ESP induction-motor category.

Describe a complete installation through its actual component list instead of using one product name to identify every device within the system.

Begin with the task: a component for an installed unit, a documented assembly, a maintenance set or a new system. Separate pump sections, motor, intake, gas-handling equipment, protective assembly, cable and surface control.

Each may have its own markings and records alongside the overall installation documents.

Documents for the installed equipment

Provide clear nameplate photographs and the current system component list. Each replacement-item line should retain the manufacturer, complete type, serial number, original reference and quantity.

Where an item comes from an assembly drawing, include the document number and mark the requested position on the attached copy.

Group records by pump section, motor, cable circuit and surface equipment. An overall document establishes the configuration, while an independently identified device may require its own parts list.

Preserve both levels of information and keep an internal stock code separate from the original reference unless their correspondence is established.

After modification, submit the current composition and identify replaced components. Older records can be included for comparison with their dates and revisions.

If a number is missing, state that explicitly and attach available photographs, drawings and operating records; do not fill a missing field with data from a similar item.

ESP motors, pumps and gas-handling devices

For a CENtrilift motor, preserve the complete marking, suffixes and its own serial number. State whether the need is a complete motor, assembly or listed internal item.

Electrical and construction details should come from the nameplate and documents, with any required accompanying components and retained connections identified separately.

For a pump section, attach its own marking and installed-configuration records. The published LIFTPrime E2000 designation helps identify the family, but internal components require the original parts list and marked drawing.

Document kit contents and distinguish the number of kits from the quantity of individual items within them.

Keep intakes, ACE Plus gas-handling pumps, Boosted GasSep separators and ESP seals under their own references. Show their association in the system list while retaining separate component lines.

A protective assembly’s catalogue category does not define its particular contents; attach the applicable drawing or assembly list for the installed equipment.

Cable, power and control requirements

For an ESP cable, preserve the original designation and available product documents. State the required length or quantity with units and list connection elements separately. For a repeat order, compare the earlier list with the actual installed marking.

If the cable forms part of a set, identify the contents explicitly.

For a variable speed drive or switchboard, provide the complete device type, nameplate and electrical documentation. Internal modules, connections and independently marked instruments should retain their own references and association with the particular cabinet.

Keep the applicable circuit revision with the enquiry rather than relying on a generic control-system name.

When replacing surface control equipment, describe the retained installation and project interfaces. Separate hardware from software, licences or remote services.

A manufacturer’s digital portfolio does not mean those functions are automatically included with a hardware order; define each required element and its relationship to the proposed equipment scope.

Gas lift, monitoring and surface pumping

Gas-lift mandrels, valves, sensors and gauges should be identified individually through their original references and installed-arrangement documents. Indicate a single item, assembly or set clearly.

Retain quantities by component and preserve the source of the designation, especially where a site list uses abbreviated names for different devices.

For well-monitoring equipment such as SureSENS, provide the device marking, records and requested contents. Cables, connectors and surface devices should appear as separate lines when included.

If the monitoring arrangement changes, describe required measurements and retained connections through project documents, distinguishing equipment from software and field work.

For HPump surface pumping, retain the identification of the particular pump, frame, thrust chamber or other device. The overall system description provides context but does not replace component documents.

Replacement items should follow their own assembly references, while a new package requires a defined duty and supply boundary.

New systems, procurement lists and receiving

A new system requires a technical assignment describing its purpose, working medium and project operating cases. Include available well or surface-process data, installation conditions and power and control boundaries.

Preserve units and source documents, keeping different operating cases separate and identifying existing infrastructure intended to remain in service.

Prepare a table containing the installation, device, complete type, serial number, original item, quantity and technical attachment. Distinguish immediate maintenance requirements from reserve stock.

A documented set should retain both its contents and the number of sets, with consistent line numbering between the table and attached files.

Specify applicable documentation and completeness requirements before ordering. Issue a new list revision when scope changes and identify amended lines.

On receipt, compare markings, quantities and contents with the agreed list, then keep the received records with the operating documents for the particular installation. Begin an enquiry with nameplates, the component list, quantities and a work contact.

Confirmation of scope

Availability, price, lead time, distributor status, certificates and compatibility are not stated in advance. Configuration, supply scope and documents are confirmed for the specific enquiry.

Send the technical requirement

Send the project assignment or component list, device nameplates, quantities and a work contact.

Related Baker Hughes businesses

Documents and sources

Industrial equipment

Request a quote

Describe your requirements and attach up to 5 files, each up to 20 MB.

You can also drag photos or documents here.

You can also email us. Opening your email app does not send an enquiry automatically.

WeChat · Nastia

English-speaking contact

Nastia — scan this QR code to add her on WeChat

Scan the QR code to add Nastia on WeChat.

Save QR image

On this phone: save the image, then choose it from your photos in WeChat’s scanner.

Telegram · Nastia

Contact Nastia

Telegram QR code: @ananasprosto

Scan the QR code or open @ananasprosto in Telegram.@ananasprosto in Telegram.

Save QR image

Scan the QR code or open @ananasprosto in Telegram.