FATEK PLCs, operator terminals and servo drives

Source FATEK controllers, operator terminals, I/O modules and servo drives for new control cabinets and machine retrofits.

FBs controllers

FBs controllers handle machine logic and high-speed signals. Hardware counters accept encoder pulses. Specify the power supply, output circuit and installed communication boards when replacing a base unit.

  • FBs PLC
  • High-speed counters
  • Pulse outputs
  • WinProladder

B1, B1z and HB1 controllers

Use B1 when the project calls for expansion I/O. B1z is intended for fixed I/O configurations. HB1 mounts with a FATEK terminal, so specify the enclosure and connector arrangement by model.

  • Expandable B1
  • Fixed I/O B1z
  • HB1 for terminal mounting
  • WinProladder

M series controllers

The M series is an option for a new machine control design. Programs for M controllers are developed in UperLogic. In a retrofit, scope the I/O map, program migration and cabinet components separately.

  • M series
  • UperLogic
  • Machine control project
  • I/O mapping

P5 operator terminals

A P5 terminal displays machine variables and status received from the controller. Screen projects are created in FvDesigner. Verify the door cutout, power supply, communication port and project file before replacing the terminal.

  • P5 HMI
  • Screen project
  • FvDesigner
  • Panel cutout

B1 input and output modules

B1-6AD handles analog inputs and B1-2DA provides analog outputs. FATEK lists B1-2/6TC and B1-6RTD for temperature measurement. Check the base unit and the connected sensor type before selecting an expansion module.

  • B1-6AD
  • B1-2DA
  • B1-2/6TC
  • B1-6RTD

B1 communication modules

The B1 expansion family includes B1-CM25E and B1-CM55E. Select the module to suit connected devices and its position in the controller configuration. Record the board marking and the purpose of each port before ordering.

  • B1-CM25E
  • B1-CM55E
  • Board identification
  • Port settings

SC3 and SD3 servo drives

FATEK lists the SC3 and SD3 servo families. Specify the drive for the motor and axis, including feedback and command interface requirements. FATEK provides ProTuner for SC3 setup.

  • SC3
  • SD3
  • ProTuner for SC3
  • Motor matching

Remote I/O stations

FATEK lists network adapters in a dedicated I/O Coupler family. Specify each station for the controller network and the signals at its installation point. Check station power and module order alongside the I/O list.

  • I/O Coupler
  • Remote station
  • Channel map
  • Module order

Specify the PLC for the machine

Start with the machine sequence and separate signals by electrical function. List the discrete sensors and loads, analog reference signals, temperature sensors and channels that require hardware counting.

In a packaging retrofit, for example, the encoder and registration sensor can be more important to the base-unit decision than the total number of general purpose inputs. Include interlocks and status signals exchanged with the upstream and downstream equipment.

Choose B1 where a base unit must support expansion. A B1z unit suits a defined configuration with fixed I/O. If cabinet layout requires the PLC to mount with an operator terminal, specify the HB1 model and the matching FATEK terminal together.

A drawing of the enclosure helps establish the expected connector clearance, installation depth and the available space for expansion.

For an FBs installation, confirm the model suffix, the fitted communication hardware and the WinProladder project before specifying replacements. For a new M series design, use UperLogic as the engineering environment and identify which machine functions must be implemented and accepted.

When moving an existing machine to M, allow engineering time for program migration, I/O reassignment and sequence testing.

Plan cabinet expansion and communications

Prepare an I/O schedule with one line per module. The schedule should record the function, signal format, channels in use, connector assignment and planned spare channels. On a B1 system, count analog outputs separately from analog inputs.

When a temperature sensor is specified, state whether the signal comes directly from the sensor or from a separate transmitter. This affects the module required and the wiring work needed at the cabinet.

List the device attached to each active port before selecting a communication module. Record the protocol, connection type and any existing addressing convention. If the PLC exchanges values with several outside devices, identify where the time-sensitive messages originate.

The drive, terminal and supervisory system can have different communication requirements even when they are installed at the same machine.

Specify the operator terminal and screen package

For a P5 terminal, check the dimensions of the door opening, cabinet depth and connector clearance alongside the screen size. For a factory program already in use, request the FvDesigner source project and determine which devices are included.

Document whether the screen displays PLC state, writes setpoints or gives access to maintenance operations. This helps distinguish the standard terminal package from application engineering work.

Before a retrofit, agree the screens and functions that must be present on the replacement panel. Identify any local configuration that the old project holds and any parameters retained in the PLC.

For a new cabinet, include the mounting arrangement, power connection and communication accessories as separate items when they are in the purchasing scope.

Match equipment for a servo axis

A servo equipment request should describe the drive, motor and motion requirements together. Include speed and acceleration limits, the type of load and the actual motor reference when one is already fitted.

If an existing harness is to be retained, provide its markings and the connector arrangement. Check the requested feedback signal and command interface against the controller design.

FATEK catalogs the SC3 and SD3 families separately. Use the matching family documents to confirm the requested drive and motor. FATEK provides ProTuner for SC3 setup.

Before commissioning work is quoted, establish who supplies the axis parameters, how the brake is controlled and which travel or positioning checks are required on the assembled machine.

Define remote stations and supply boundaries

A remote I/O station requires the controller network, power arrangement and intended signal mix to be specified. Identify the adapter and the order of modules in every station. For a conveyor or production line with several cabinet locations, label the station list by position.

This makes it possible to match the order with the installation drawing and avoids swapping modules between similar stations.

For an extension to an existing network, share the available controller configuration and any restriction on device addresses. Confirm what the machine must do during a loss of communication or when a station is powered up again.

Acceptance is easier if each remote station has a checked list of test points for digital and analog signals.

A request for a quote can cover a single replacement, a matched PLC and terminal, or a complete cabinet bill of materials. State the destination, indicate which accessories are already available and identify any project files that must be carried over.

Once technical suitability has been verified, the item list and supply terms can be agreed for the selected configuration.

Spare units and documentation for a fleet

If the order covers more than one line, identify the equipment by machine and cabinet before consolidating the item list. The same PLC family may have been installed with different output circuits, power supplies or communication boards.

Record the full model of each fitted device and include cabinet drawings that show the field connections. Verify common spare units against each configuration before putting them into a shared stock list.

For phased upgrades, agree which machine will receive the first configuration and what the production team will check before the next cabinet is built. Establish who retains the PLC and display source files, and whether the project is delivered as part of the order.

A versioned equipment schedule should cover each controller, terminal, expansion module and axis. Use that schedule to record substitutions and to agree acceptance tests for the first machine.

The final order can then distinguish tested combinations, spares and accessories that the customer already holds.

FATEK and model names are trademarks of their respective owners and are used only to identify the equipment for which we source parts. SpareX is not an official dealer, distributor or representative of FATEK and is not affiliated with the trademark owner. Origin, documents and warranty are stated for each item in the quotation.

Related equipment manufacturers

Documents and sources

Industrial equipment

Request a quote

Describe your requirements and attach up to 5 files, each up to 20 MB.

You can also drag photos or documents here.

You can also email us. Opening your email app does not send an enquiry automatically.

WeChat · Nastia

English-speaking contact

WeChat QR code: Nastia

Scan the QR code to add Nastia on WeChat.

Save QR image

On this phone: save the image, then choose it from your photos in WeChat’s scanner.

Telegram · Nastia

Contact Nastia

Telegram QR code: @ananasprosto

Scan the QR code or open @ananasprosto in Telegram.@ananasprosto в Telegram.

Save QR image

Scan the QR code or open @ananasprosto in Telegram.