Equipment selection for Bühler Grains & Food
Define grain, feed and food processing equipment by the Bühler process, raw material, required output and package boundaries.
Milling equipment and PesaMill
The manufacturer describes PesaMill as a high-compression mill for Atta and other flours. Define a milling package by the raw grain and flour specification. For an installed machine, provide the exact model, serial number and component drawing.
- PesaMill: high-compression milling
- Specify the grain and finished flour
- Attach the roll drawing and identification
SORTEX optical sorting
The manufacturer presents distinct SORTEX models, including R500, H and J SpectraVision. A new sorting project needs a commodity and defect specification. An ejector, chute or electronic assembly requires identification from the installed machine.
- SORTEX R500: rice sorting
- H and J SpectraVision are distinct models
- Identify the component and machine serial number
Kubex pelleting and Granulex grinding
The manufacturer identifies Kubex 5 Series as pellet mills and Granulex 5 Series as hammer mills. Separate a new feed processing package from a wear-part enquiry. Identify dies and rollers separately from hammers and screens.
- Kubex 5 Series: pellet mills
- Granulex 5 Series: hammer mills
- Specify feedstock, product size and model
Chocolate processing, Nova and SmartChoc
The manufacturer describes Nova and SmartChoc ball milling for chocolate masses and compounds. Define the required processing step and product before selecting a machine. For an installed line, identify the individual unit rather than only the line name.
- Nova and SmartChoc: ball milling
- DoMiReCo combines several processing steps
- Distinguish mill, mixer and conche
Pasta lines and Ecothermatik
The manufacturer describes Ecothermatik as a dryer for long-goods pasta. A project enquiry should identify the product format, raw material and drying task. For a replacement component, provide the installed dryer model and line diagram.
- Ecothermatik: long-goods pasta drying
- Specify product format and raw material
- Identify the dryer and component position
Malting, TAS and grain cleaning
The manufacturer's malting portfolio includes TAS grain cleaners and Ultratrieur indented separators. Define the grain, processing stage and required separation task. For a screen, drive or aspiration component, identify the installed model and position.
- TAS: universal grain cleaning
- Ultratrieur: separation by length
- Provide screen dimensions and installation position
How to identify the machine and the required part
Start with a readable machine nameplate and an overall photograph. For a grain or food processing line, retain the complete model designation, serial number and recorded year. Photograph the component label, connectors, mounting points and installation position separately.
Include each visible identification code rather than selecting the code that appears most likely.
State whether the enquiry concerns one component, an assembled unit or a set for several machines. A drawing position helps distinguish the machine designation from the part number.
This provides a defined starting point for technical clarification and allows the required scope to be agreed before a replacement is considered.
How to define a new equipment project
Describe the incoming material, required finished result and the position of the proposed machine in the process. Examples include a sorter, mill, pellet mill or dryer. State the production rate together with its units, material properties and operating schedule.
Average demand and a short peak load should be identified separately because they affect the process specification.
Attach a layout and identify the equipment upstream and downstream. Provide available floor space, access dimensions and utility information. Specify whether the request covers one machine or a package with controls and peripheral units.
A clear boundary makes different proposals comparable and identifies missing project information before a configuration is selected.
How to document operating conditions and interfaces
State the process temperature, medium, product contact conditions and cleaning method. An electrical component needs its supply information and a connector photograph.
A component connected to process piping needs connection dimensions and the pressure information from the installation documentation. These values describe the specific installation and require separate checking.
Include special material requirements and the available maintenance access. For a grain or food processing line, an interface drawing with the relevant component marked is particularly useful.
External appearance can guide identification, while the proposed configuration is checked against documentation, markings and the actual operating duty. Describe previous modifications where they affect the connection or function.
How to submit drawings and a bill of materials
Send the part list together with the relevant assembly drawing. Retain document numbers, revision information, item positions and the name of the assembly. Give the quantity and unit for every requested item.
Identify equipment packages and replacement components separately when both appear in the same enquiry.
An existing list and photographs can be used as the initial package, with missing information added during clarification. Mark items that belong to one repair set or must arrive together. We review the requested scope and identify the information still needed for a quotation.
This helps distinguish a drawing reference from an ordering code and avoids treating an incomplete list as a defined machine package.
How to describe a fault or a wear condition
Describe the observed symptom and when it occurs. Explain whether it changes during start-up, warm-up, load changes or a change of product. State which measurements and maintenance activities have already been performed.
Identify previously replaced components and any changes to the installed configuration. Photographs of the affected area can support the description.
If a grain or food processing line displays a control message, provide its complete wording and panel identification. A part enquiry and a service discussion can be included in one request when their respective scopes are identified.
The required service work is assessed from the available information and installation condition rather than inferred from the model name alone.
How to compare configurations and agree a replacement
Compare the component function, interfaces, construction material and role in the machine. For a grain or food processing line, retain information about modifications and photographs of the actual installation.
When a different configuration is considered, identify the parameters that need checking before it can be accepted.
The quotation should define the item and the included equipment so your technical team can compare them with the installation documentation. Identify required accessories and existing components that will be retained.
This supports a practical comparison of mounting dimensions, connections and process requirements. A shared family name or similar appearance alone is insufficient to define an interchangeable assembly.
How to prepare an enquiry and review a quotation
Send the item list, quantities, machine model and identification material through the enquiry form or the published contact details. State the delivery destination and any required date that determines the maintenance task.
For a new equipment project, include the process brief and the expected package boundaries. Identify any documentation needed for your purchasing procedure.
We review the information, separate equipment from spare parts and clarify the proposed scope. The quotation records the agreed items, quantities, payment conditions and transport arrangement.
The response schedule is agreed after reviewing the available information and the technical clarifications required. A complete starting package makes the review more efficient and reduces uncertainty about what is being requested.
How to plan transport and receiving inspection
Provide the delivery location, unloading restrictions and packaging requirements. For an assembled unit, identify access dimensions and handling constraints at the installation site.
A package containing several items needs agreed identification of shipping units and a document list for receiving inspection. Clarify whether the destination requires a combined shipment or separately identified components.
On receipt, compare item identities and quantities with the agreed list, inspect the packaging and retain labels until the inspection is complete. Give the documentation to the team responsible for installation.
Operating and commissioning parameters must follow the instructions for the specific machine. Delivery of an individual component does not replace preparation of the installation for its maintenance procedure.
Related manufacturers
Bühler Grains & Food and model names are trademarks of their respective owners and are used only to identify the equipment for which we source parts. SpareX is not an official dealer, distributor or representative of Bühler Grains & Food and is not affiliated with the trademark owner. Origin, documents and warranty are stated for each item in the quotation.
