Kulicke & Soffa (K&S) bonding equipment
Select Kulicke & Soffa (K&S) equipment for ball bonding, wedge bonding and thermo-compression with tooling for the target package.
RAPID Pro ball bonding
RAPID Pro is a ball wire bonder for demanding copper wire applications. Tool selection depends on the wire, pad and installed bond head. The capillary has to match the qualified process.
- RAPID Pro platform
- Copper wire
- Ball bonding
- Replaceable capillary
PowerFusion wedge bonders
PowerFusion is available in TL, HL and HLx configurations. HL handles wire and PowerRibbon. HLx extends the leadframe handling range. The head configuration depends on the selected system.
- TL, HL and HLx
- Wire and ribbon
- Power device matrices
- Multiple head configurations
Asterion wedge bonders
Asterion is a wedge bonding platform. Supported configurations handle wire and ribbon interconnects. For hybrid modules, check the bondable area, fixture and head access over the part.
- Asterion platform
- Wedge bonding
- Hybrid modules
- Wire and ribbon options
APAMA thermo-compression bonding
APAMA is a thermo-compression bonding platform. The series covers die placement on substrates and other dies. The system specification should define the carrier, tooling and thermal profile for the package.
- APAMA series
- Die to substrate
- Die to die
- Thermal profile
Wedge tools for wire and ribbon
The K&S catalogue distinguishes wire wedges from ribbon wedges. Foot length and groove dimensions specify the working geometry. The standard groove helps control material deformation. Tool fit depends on the bond head.
- Wire wedges
- Ribbon wedges
- Standard geometry
- Groove geometry
Capillaries for ball bonding
K&S supplies capillaries for wire bonding. The CIC series supports fine-pitch bonding with gold and copper wire. Replacement tools are compared against the working-end dimensions and the qualified process tolerances.
- K&S capillaries
- Gold wire
- Copper wire
- Fine-pitch pads
Select the platform by package and operation
Choose a machine for the operation performed at the station. Ball bonding, wedge bonding and thermo-compression each impose different constraints on the product, tooling and feed.
A package drawing and a process sequence make it possible to identify which operations belong at the station and which are completed upstream or downstream. Where a station replaces an existing machine, describe the changes required in its actual production setting.
Check whether the equipment will work with one package or several product families. A dedicated station can be configured for a defined carrier and set of bonds. A shared station needs a practical changeover and a way to identify the tooling for each product.
Agree which format should be qualified first and how inspection will be performed after a change.
Set out how the part moves through the station. Manual handling for engineering trials and automatic loading in production lead to different integration requirements.
If the equipment is paired with other stations, define responsibility for the transfer interface and the signals used to confirm that a part has arrived or left.
Specify the package for ball bonding
Describe wire material, pad dimensions, neighbouring structures and acceptable loop geometry. Minimum pad pitch alone cannot establish that the head can reach all positions. A representative drawing should show the positions with the tightest clearance and the product orientation in the carrier.
This helps establish whether the proposed equipment and capillary cover the full bond program.
A move to copper wire involves both machine configuration and process qualification. The selection of the capillary depends on the material and the requirements at each pad. Ask for the machine and tool combination used in the quotation to be stated explicitly.
Keep the qualified set of parts associated with the corresponding product revision so subsequent orders can use that record.
For a RAPID Pro replacement or addition, check which fixtures can be retained and which need revision. Existing equipment may share a package format with the new station while using different head tooling.
Separate the configuration needed for the initial production release from later tooling for optional products. This makes it easier to compare offers without losing the changeover requirements.
Configure a wedge bonder for the actual part
PowerFusion and Asterion selections should describe the wire or ribbon together with the leadframe or module that receives it. Tooling depends on the installed head and the part restraint. A carrier suitable for a compact exposed frame may not leave enough clearance to bond inside a deeper housing.
Compare the path of the tool with the package illustration before the mechanical layout is agreed.
State which positions must be reached with the part secured. Overall machine travel and clear working area are different measurements if clamps or package features occupy part of the space. Provide a sketch of the extreme positions and the intended clamping arrangement.
Where an additional fixture is required, agree its interface before specifying the complete machine.
Compare PowerFusion versions by the intended product format and head configuration. A system selected for one family of power devices may still require a different guide or cutter for another material.
For a multi-product station, clarify which parts are supplied for each product and which are expected to remain on the machine during a change.
Specify tooling and the qualification sample
List the wedge, capillary, guide, cutter and part fixture separately. This allows each item to be checked against the material, head configuration and sample drawing. Replacement tools should be linked to the product and machine configuration that passed qualification.
For procurement, a tool description with its drawing and relevant process is more useful than a family name alone.
Use a sample that represents the intended production conditions. The acceptance record should identify the product revision, batch of material, positions to inspect and the method of measurement. If the fixture or tool changes during qualification, record the combination in use.
That record helps reproduce the configuration when a tool wears out or an additional machine is purchased.
Make the inspection requirement explicit for both loading and bonding. A fixture can hold the part firmly during the bond cycle while still allowing an unacceptable shift at loading. Record when the part is measured and which locating features are used.
This gives the engineering team a common basis for comparing the sample with the intended production layout.
Assess the APAMA thermo-compression application
For a thermo-compression inquiry, describe the die, substrate, carrier and intended joining process. Tooling has to fit the way the die is handled and aligned. The thermal profile is part of the specification alongside the geometry and acceptance targets.
For packages with several assembly stages, state which step is completed at the station and what happens to the assembly immediately after bonding.
Platform capability and product qualification are evaluated with different information. Check the proposed machine configuration against the application and use representative specimens when establishing a process result.
Substrate or carrier behaviour during heating can affect the way the part has to be supported. Where an existing process is transferred, agree which information will be retained from the original installation.
Set out what is included in the delivery and which facilities the site provides. Examples include fixtures, electrical and control connections and the parts needed for initial acceptance.
If the supply consists of a machine and a tooling package, identify how each is checked at delivery and during setup.
Agree the supply scope and acceptance method
A quotation request should identify the operation, package format, consumables, interface to other equipment and available floor space. For a replacement, include the installed machine layout and the parts of the process expected to change.
Request a supply list detailed enough to confirm whether fixtures, bonding tools, connection cables and setup work are included.
Separate the equipment required for first production from options for a future package. Confirm how the equipment can be changed over and what should be tested after installing the next fixture.
Where equipment is integrated with an existing line, agree loading dimensions and interface signals before the order is confirmed. That information can be checked before the equipment reaches the production floor.
Define acceptance conditions in measurable terms and record which sample and measurement method will be used. If throughput is important, agree how loading, unloading, inspection and changeover are treated in the timing.
Quality of placement and stability of the process should be assessed on the agreed package rather than assumed from the nominal speed of the station.
Kulicke & Soffa and model names are trademarks of their respective owners and are used only to identify the equipment for which we source parts. SpareX is not an official dealer, distributor or representative of Kulicke & Soffa and is not affiliated with the trademark owner. Origin, documents and warranty are stated for each item in the quotation.