Equipment selection for PATLITE signalling and lighting
We select signal towers, network annunciators, beacons and machine work lights by PATLITE model. Send the application, control interface and mounting requirements for a defined equipment package.
LR4, LR5 and LR6 modular towers
According to the manufacturer, LR towers use Twist and Lock light and sound modules. A replacement module is selected against its series and base code; a complete tower also needs the mounting and supply checked.
- LR4 diameter 40 mm; LR5 diameter 50 mm
- LR6 diameter 60 mm
- Light and sound modules for LR6
- Confirm the complete assembly code
LA6 programmable indication
LA6 supports configurable colour indication. The manufacturer lists 21 programmable colours and several lighting effects. Selection starts with the operating sequence and the signals available from the machine.
- 21 programmable LED colours
- Continuous, flashing and pulsing light
- Versions with 3 or 5 tiers
- Provide the model and display sequence
NHV4 and NHV6 network annunciators
NHV links network events to visual and voice notification. The manufacturer describes text-to-speech conversion. Digital inputs, outputs and PoE are assigned to specific versions rather than the whole family.
- SNMP and PING availability monitoring
- TTS converts text into voice
- NHV-D / DP: 4 inputs and 2 outputs
- PoE is provided on NHV-DP only
LR6-IL towers with IO-Link
The manufacturer specifies an integrated M12 connection to an IO-Link master. A project needs the master, port and tower arrangement checked together. A repair request should distinguish the base from individual modules.
- Integrated 5-pin M12 connector
- Up to 5 light tiers
- One optional buzzer unit
- Provide both master and tower models
WIO wireless control units
WIO transfers status between transmitter and receiver using Bluetooth Long Range. The stated range of up to 100 m applies to line of sight. An actual factory layout needs the path and obstructions reviewed.
- WIO-B1T transmitter
- WIO-B1R receiver
- Up to 100 m in line of sight
- Up to 8 groups in the same area
SF08 and SF10 multifunction beacons
SF08 and SF10 create warning effects without a rotating motor. The manufacturer lists 22 light patterns. Selection needs the full beacon code, supply, mounting arrangement and required indication.
- Motorless LED construction
- 22 selectable light patterns
- Simulated rotation, flashing and pulsing
- Check supply and buzzer by model code
EHS audible alarms
The manufacturer lists PNP and NPN transistor inputs and a set of built-in sounds for EHS. Selection depends on power supply, termination and the way the controller chooses the warning signal.
- 32 pre-installed sounds
- PNP / NPN input control
- Cable or screw terminal connection
- Provide the code and alarm sequence
CLK-02 machine work lights
CLK-02 lights illuminate the equipment working area. The manufacturer provides standard and spot lens options. A replacement needs the illuminated length and electrical connection checked against the exact version.
- CLK1 / CLK3 / CLK6: 100 / 300 / 600 mm
- Selected versions operate on 24 V DC
- Standard or spot lens
- Provide the code, connector and mounts
Identify the device before selecting a part
Start with the complete device marking and a clear photograph of the component to be replaced. Distinguish a light module, buzzer, base, cover, cable or mounting bracket. A picture of one coloured lens does not establish the supply or connection used by the complete tower.
Include the machine position so the mounting arrangement is visible.
When a marking is damaged, send the overall dimensions and the relevant wiring diagram instead of guessing the remaining characters. Record the number of tiers, colour order and whether a sound unit is fitted. Keep different base versions on separate request lines even when the towers look similar.
This produces a defined replacement task and helps decide whether to select one module or a complete assembly.
Define the electrical interface
Record the rated supply shown on the device and the type of source available at the installation. Then describe how the controller activates each light or sound. Supply voltage and control input are separate selection points.
For an existing LR6 assembly, the base code is part of the information required to choose a replacement module.
Send the terminal diagram or a connector photograph showing its contact arrangement. Include the controller output type and identify signals already assigned to individual wires. A new installation benefits from a signal table that maps machine events to indication.
Agree the mapping across all stations involved in the project. The site electrician checks the final connection against the manual for the selected model before the equipment is energised.
Check mounting and the installation environment
Provide the fixing arrangement, hole spacing, available height and cable entry direction. Show whether the device mounts directly, on a pole or on a bracket. State whether the existing holes must be retained and whether there is access to the fasteners during maintenance.
A wider photograph can be more useful than a close-up of the lens.
Describe temperature, dust, moisture, cleaning and contact with process fluids. An enclosure rating must be read together with the specific model and its installation conditions. For damaged covers or seals, photograph the affected area.
With a work light, also show moving machine parts and the intended direction of illumination. These inputs allow the equipment and its mounting accessories to be considered as one defined installation package.
Turn the operating sequence into an indication plan
For a new tower, list each machine state, the required colour, lighting effect, sound and the operator action. Separate normal running, waiting for material, cycle completion and faults.
The purpose of the display is to make these conditions distinguishable at the actual viewing position, so the number of tiers should follow the sequence.
LA6 is relevant when the project calls for configurable colour patterns; LR is relevant to a modular tower arrangement. If indication changes after a timed interval or a sequence of input pulses, describe the complete cycle. Include viewing distance, direction and surrounding light.
When replacing an existing system, provide the site indication legend so the equipment selection can retain familiar meanings for the people who use it.
Specify network and IO-Link requirements
For NHV, identify the source of the event, such as a network device, software system or machine controller. State the required response, voice language and whether digital inputs or outputs are needed. If network power is required, name the NHV-DP version explicitly.
An Ethernet connection alone does not establish that the requested unit supports PoE.
For LR6-IL, supply the IO-Link master model, port details and desired arrangement of light and sound modules. A discrete-input tower, a network annunciator and an IO-Link device use different integration paths. Have the automation engineer confirm the interface and signal list before ordering.
The proposed package can then distinguish the annunciator, connecting cable, mounting hardware and configuration work to be performed by the receiving site.
Plan the wireless path on the factory floor
For WIO, send a layout showing transmitter and receiver positions. Mark walls, metal enclosures, machinery and moving obstructions between the points. A line-of-sight range does not calculate coverage inside a particular factory.
The selection request therefore needs the real installation geometry rather than the straight-line distance alone.
List the states to be transferred, the groups involved and the devices to be driven at the receiving end. Identify the power available at each position and the required behaviour if communication is interrupted. For an extension, include the markings of installed units.
The site should verify operation at the proposed mounting positions during commissioning. Use those observations to finalise placement and the connection to the machine signals; radio indication should be assessed within the wider project requirements.
Choose sound and beacon behaviour for a defined event
For EHS, explain what each sound means, such as requesting assistance, completing a process or reporting a fault. State how the controller selects a sound, whether attenuation is needed and where the unit will be mounted. The complete code also distinguishes cable and terminal connection versions.
For SF08 and SF10, begin with the effect operators need to recognise: flashing, pulsing or simulated rotation. Then confirm the supply and mounting. If a simple beacon is being replaced by a configurable device, review whether existing signals can operate the chosen sequence.
Ambient noise, hearing protection and visibility belong in the site assessment. Equipment selection provides the defined hardware inputs; it does not substitute for the plant notification system design or its commissioning procedure.
Select lighting around the work area
For CLK-02, show the area to be illuminated and its distance from the proposed light position. Include the workpiece, mounting points and any requirement to change the beam direction.
The standard and spot lenses distribute light differently, so a replacement request should describe the inspection or process observation task.
State exposure to coolant, chips and cleaning products. Give the complete light code because illuminated length alone does not identify the connection. If several lights are needed, mark their positions on a drawing and identify the power source.
Keep the light, cable and mounting accessories as separate lines in the equipment package. Before installation, the receiving site checks the wiring, access and clearance from moving components against the selected device documentation.
Prepare a quotation request for an equipment package
Send a list with complete model codes, quantities, the function of each item and the delivery destination. Repair requests need the device marking and a description of the symptom. New projects need the signal table, mounting layout and interface requirements.
Identify which lines represent complete devices and which are modules or accessories.
SpareX uses this information to define the proposed equipment package and the technical questions still to be resolved. The item list can include signal towers, network annunciators, beacons, sound devices and work lights within the same project.
Keep receiving requirements, packing constraints and the requested document list with the enquiry. A shared line reference for each machine position helps the engineering and purchasing teams check the same configuration before order confirmation and again when the equipment is received.
Check the package before installation
At receipt, compare the markings on the devices with the agreed item list and check quantities, connection versions and mounting accessories. For a modular tower, check the base and individual tiers separately.
For a work light, check the model, lens option and cable connection; for a network device, record the complete version code.
Keep the link between each item and its intended machine position. Before fitting the devices, the receiving site performs the connection checks required by the relevant documentation. Agree the event table for programmable indication and retain configuration records using the plant procedure.
If a discrepancy is found, send a photograph of the marking together with the affected item reference. This provides a precise starting point for checking the package without reconstructing the order from the appearance of the equipment.
Related manufacturers
PATLITE and model names are trademarks of their respective owners and are used only to identify the equipment for which we source parts. SpareX is not an official dealer, distributor or representative of PATLITE and is not affiliated with the trademark owner. Origin, documents and warranty are stated for each item in the quotation.
