Equipment selection for Bühler Advanced Materials

Define die-casting, grinding and vacuum-coating equipment by the Bühler process, material, production target and package scope.

Carat, Ecoline DS and Evolution die casting

The manufacturer specifies aluminum and magnesium applications for these systems. Select the machine by component geometry and process requirements. A shot-system, hydraulic or peripheral component requires the complete installed model and serial number.

  • Carat locking force: 10 500–92 000 kN
  • Ecoline DS: 3 400–9 000 kN
  • Evolution: 2 600–9 000 kN

Cenomic bead milling and MacroMedia

The manufacturer describes Cenomic for wet bead milling and MacroMedia for the pre-grinding stage. Define the material and target result for a process package. A chamber, seal or drive enquiry also needs identification of the installed machine.

  • Cenomic: low to medium product viscosity
  • MacroMedia: pre-grinding preparation
  • Specify chamber, medium and component identity

Trias three-roll dispersing

The manufacturer describes Trias for pasty materials such as metal pastes and printing inks. A process enquiry should define the paste and quality target. A roll, scraper, drive or cooling assembly requires model, dimensions and installation details.

  • Trias: three-roll dispersing
  • Examples include metal pastes and printing inks
  • Specify roll material and cooling conditions

Leybold Optics coating and HELIOS

Bühler Leybold Optics develops thin-film vacuum-coating equipment. HELIOS is a magnetron coating system for precision optical applications. Define the coating task for a new system, or provide the chamber and component identity for a replacement.

  • HELIOS: precision magnetron coating
  • Applications include optics, glass and semiconductors
  • Identify the pump and coating system separately

How to identify the machine and the required part

Start with a readable machine nameplate and an overall photograph. For a materials processing installation, retain the complete model designation, serial number and recorded year. Photograph the component label, connectors, mounting points and installation position separately.

Include each visible identification code rather than selecting the code that appears most likely.

State whether the enquiry concerns one component, an assembled unit or a set for several machines. A drawing position helps distinguish the machine designation from the part number.

This provides a defined starting point for technical clarification and allows the required scope to be agreed before a replacement is considered.

How to define a new equipment project

Describe the incoming material, required finished result and the position of the proposed machine in the process. Examples include a processing unit, bead mill, three-roll mill or coating chamber. State the production rate together with its units, material properties and operating schedule.

Average demand and a short peak load should be identified separately because they affect the process specification.

Attach a layout and identify the equipment upstream and downstream. Provide available floor space, access dimensions and utility information. Specify whether the request covers one machine or a package with controls and peripheral units.

A clear boundary makes different proposals comparable and identifies missing project information before a configuration is selected.

How to document operating conditions and interfaces

State the process temperature, medium, product contact conditions and cleaning method. An electrical component needs its supply information and a connector photograph.

A component connected to process piping needs connection dimensions and the pressure information from the installation documentation. These values describe the specific installation and require separate checking.

Include special material requirements and the available maintenance access. For a materials processing installation, an interface drawing with the relevant component marked is particularly useful.

External appearance can guide identification, while the proposed configuration is checked against documentation, markings and the actual operating duty. Describe previous modifications where they affect the connection or function.

How to submit drawings and a bill of materials

Send the part list together with the relevant assembly drawing. Retain document numbers, revision information, item positions and the name of the assembly. Give the quantity and unit for every requested item.

Identify equipment packages and replacement components separately when both appear in the same enquiry.

An existing list and photographs can be used as the initial package, with missing information added during clarification. Mark items that belong to one repair set or must arrive together. We review the requested scope and identify the information still needed for a quotation.

This helps distinguish a drawing reference from an ordering code and avoids treating an incomplete list as a defined machine package.

How to describe a fault or a wear condition

Describe the observed symptom and when it occurs. Explain whether it changes during start-up, warm-up, load changes or a change of product. State which measurements and maintenance activities have already been performed.

Identify previously replaced components and any changes to the installed configuration. Photographs of the affected area can support the description.

If a materials processing installation displays a control message, provide its complete wording and panel identification. A part enquiry and a service discussion can be included in one request when their respective scopes are identified.

The required service work is assessed from the available information and installation condition rather than inferred from the model name alone.

How to compare configurations and agree a replacement

Compare the component function, interfaces, construction material and role in the machine. For a materials processing installation, retain information about modifications and photographs of the actual installation.

When a different configuration is considered, identify the parameters that need checking before it can be accepted.

The quotation should define the item and the included equipment so your technical team can compare them with the installation documentation. Identify required accessories and existing components that will be retained.

This supports a practical comparison of mounting dimensions, connections and process requirements. A shared family name or similar appearance alone is insufficient to define an interchangeable assembly.

How to prepare an enquiry and review a quotation

Send the item list, quantities, machine model and identification material through the enquiry form or the published contact details. State the delivery destination and any required date that determines the maintenance task.

For a new equipment project, include the process brief and the expected package boundaries. Identify any documentation needed for your purchasing procedure.

We review the information, separate equipment from spare parts and clarify the proposed scope. The quotation records the agreed items, quantities, payment conditions and transport arrangement.

The response schedule is agreed after reviewing the available information and the technical clarifications required. A complete starting package makes the review more efficient and reduces uncertainty about what is being requested.

How to plan transport and receiving inspection

Provide the delivery location, unloading restrictions and packaging requirements. For an assembled unit, identify access dimensions and handling constraints at the installation site.

A package containing several items needs agreed identification of shipping units and a document list for receiving inspection. Clarify whether the destination requires a combined shipment or separately identified components.

On receipt, compare item identities and quantities with the agreed list, inspect the packaging and retain labels until the inspection is complete. Give the documentation to the team responsible for installation.

Operating and commissioning parameters must follow the instructions for the specific machine. Delivery of an individual component does not replace preparation of the installation for its maintenance procedure.

Related manufacturers

Bühler Advanced Materials and model names are trademarks of their respective owners and are used only to identify the equipment for which we source parts. SpareX is not an official dealer, distributor or representative of Bühler Advanced Materials and is not affiliated with the trademark owner. Origin, documents and warranty are stated for each item in the quotation.

Documents and sources

Industrial equipment

Request a quote

Describe your requirements and attach up to 5 files, each up to 20 MB.

You can also drag photos or documents here.

You can also email us. Opening your email app does not send an enquiry automatically.

WeChat · Nastia

English-speaking contact

Nastia — scan this QR code to add her on WeChat

Scan the QR code to add Nastia on WeChat.

Save QR image

On this phone: save the image, then choose it from your photos in WeChat’s scanner.

Telegram · Nastia

Contact Nastia

QR-код для перехода в Telegram: @ananasprosto

Scan the QR code or open @ananasprosto in Telegram.@ananasprosto в Telegram.

Save QR image

Scan the QR code or open @ananasprosto in Telegram.